Heralding the age of hybridity

H60 - hybrid

H60-hybrid

Heralding the age of hybridity

Do you favour unitised or stick-built systems? No matter which team you’re on—it’s a judgement call you’ll never have to make again. With six different configurations based on environment, energy conditions, and architectural ambitions, the H60-hybrid symbolises the system of the future. Easy to install, low-risk, executed in a wink.

  • Decimated production and installation times
  • Depending on the modulation of the curtain wall
    • Production: 12 – 15 min/m²
    • Installation of CW grid: 10 – 15 min/hour/man
    • Glazing of the CW grid: 8 – 15 m²/hour/man
  • Installation usually in teams op 3 people

Working outside is a thing of the past

True innovation is about simplification. About stripping the process down to its very core. You know what they say—if you can’t find an easy way to get it done, you might not understand it well enough.

The installation of the future means…

  • No screws or silicone
  • No scaffolding
  • Fewer accessories
  • Fool-proof installation from the inside.

By drastically simplifying our systems, we reduce risk, generate employment for unskilled and low-skilled workers, and heighten efficiency and performance.

Patent protected USP's

Our patent-protected USPs revolutionise every part of the process:

Architectural

  • Concealed sashes (inside installation)
  • Integrated stone cladding (monolithic mullion)
  • Inverso: a nearly flat façade at the inside (monolithic mullion)
  • Structural glass fins as vertical sun louvres (monolithic mullion)
  • All kinds of external architectural structures (monolithic mullion)

HVAC

  • Concealed sashes: free “hardware” for night cooling
  • Thermal break: lowest attainable U-value
  • Semi-ventilated spandrel panels

Construction

  • Foolproof installation from the inside
  • Foolproof glazing from the inside
  • Smart glazing

How it works

Not just innovative, but revolutionary

Intro

Installation of the brackets

Installation of the mullions

Installation of the transoms

Installation of glass

Installation of spandrell panels

Evacuation of infiltration waters

Time and cost of installation

Maintenance

Economic vision

Full installation

Different configurations

Depending on the climate and energy conditions. On the other hand depending on architectural goals.

Basic

Dynamic

Glass fins

Inverso

Night cooling

Semi-ventilated